Hi,
I just installed Arcserve r12 on a server at work, and I am trying to get my head around the multitude of options for backing up data.
A bit of background: I am looking to backup about 13 servers, with a total full uncompressed backup size of about 130Gb.
Heres what I want to do:
I want to enable a GFS rotation, and backup all servers on a rotation with Sunday - Full backup, and the rest differential. I also want to enable staging to backup each server and day to a certain area on a SAN.
By having a play, it doesnt look like I can enable staging and use a 7 day GFS rotation. There doesnt look to be a way to store each day in a different FSD when using a rotation...
Is it possible to do this? If so, how do I?
I will keep playing, but a pointer in the right direction would be great! Thanks!
I just installed Arcserve r12 on a server at work, and I am trying to get my head around the multitude of options for backing up data.
A bit of background: I am looking to backup about 13 servers, with a total full uncompressed backup size of about 130Gb.
Heres what I want to do:
I want to enable a GFS rotation, and backup all servers on a rotation with Sunday - Full backup, and the rest differential. I also want to enable staging to backup each server and day to a certain area on a SAN.
By having a play, it doesnt look like I can enable staging and use a 7 day GFS rotation. There doesnt look to be a way to store each day in a different FSD when using a rotation...
Is it possible to do this? If so, how do I?
I will keep playing, but a pointer in the right direction would be great! Thanks!