We like to do a complete backup of our data to a library so what we do is we have 6 tapes for the week days 4 tapes for fridays and 12 tapes for monthly backup.
for the weekely i have scheduled them to go to each tape of the week and to repeat every week. however when it comes to a monthly tape and the enod of the month is on a a weekday will that daily job run as well ? or can i have arcserve be smart and not do the daily job but only the monthly ?
Thanks
for the weekely i have scheduled them to go to each tape of the week and to repeat every week. however when it comes to a monthly tape and the enod of the month is on a a weekday will that daily job run as well ? or can i have arcserve be smart and not do the daily job but only the monthly ?