I'm using 8.6 with a library with 2 drives. I have about 15 systems split into two jobs. Each of these two jobs takes roughly 18 hours to complete a full backup.
One of backup clients is a database system and needs to be backed up within a certain time window. By default, BE runs through the systems in alphabetical order. Is there any way I can force the job to backup the database system first?
The only other option would be to create a seperate job, but I prefer not to do that.
TIA
One of backup clients is a database system and needs to be backed up within a certain time window. By default, BE runs through the systems in alphabetical order. Is there any way I can force the job to backup the database system first?
The only other option would be to create a seperate job, but I prefer not to do that.
TIA