Advanced Paging Productivity- Schedules not working 7

Status
Not open for further replies.

curlycord

Programmer
Sep 22, 2002
14,188
Toronto, Canada
I have had an issue where scheduled pages would not work and this has been going on for 2 years and I muck about with it when I can.

I am testing Fixed Time, Everyday, Greeting 36, Internal, Zone 6
I also tried Periodic every 2 minutes.

Seems after several restores and factory defaults that my problem seems to be PM.
All my testing was done in the PM...until yesterday.

I again yesterday morning did a factory reset but this time re-programmed my Callpilot from scratch and scheduled pages worked so I deemed it a glitch in my backup.
However this morning I was testing and editing a wav file with Audacity then uploading then just like that after 10 tests or so it stopped working.
I tried to see what changed and eventually noticed it was just after the noon hour so I changed the time back to 11:57 AM and set schedule to 11:58 and schedule worked.

-Some other programming is preventing PM schedules
-There really is a glitch
-There is a fix in some patch maybe I missed in reviewing them and did not make it to 022. I have only Desk 005 and System 022 installed.

If somebody else here can schedule for PM and works then it's not a glitch.

At least I am getting close.



________________________________________

Add me to LinkedIN

small-logo-sig.png

=----(((((((((()----=
Toronto, CAN
 
Hello Curlycord,

My sheduled paging has been working 100% till the begining.
I have at least 35 shedules configured!
My BCM50 gives me the time every hour from 8:00 to 22:00
It even plays a jingle of The Walking Dead every sunday at 21:00 to remind
me to watch it!

I think you should use a backup copy of my callpilot data and use it on your BCM.
Maybe this would resolve your issue.

Cheers,
SL
 
The feature of shedule page is from what release of bcm ?

i don't see anything about it on my bcm400 3.7
 
Thanks guys

Blackybear
I bet myself you would be the first to answer so I win!
I do not think a backup will do it since I re-programmed from scratch.
Now I am thinking something on Telephony side is the problem.
At least I know it works with you guys, I will be modifying another BCM shortly so I will test the schedule very first thing in case my R6 Image is the disease.
If it works fine then I will need to play with Telephony for awhile on mine.

Coincidentally it is my 6 Oclock Grandfather clock chime that I was editing.....by the time I fix this damn thing I will need a GreatGreatGrandfather clock chime.

cc


[hourglass]

________________________________________

Add me to LinkedIN

small-logo-sig.png

=----(((((((((()----=
Toronto, CAN
 
Forgot what I did next last but I think I backed up the new fresh programming of Callpilot, restored and rebooted and now its only PM and no AM....LOL

________________________________________

Add me to LinkedIN

small-logo-sig.png

=----(((((((((()----=
Toronto, CAN
 
Hi Guys !

I Just Get a BCM450 R6 and i confirm that the Page is not working !

Did not try yet AM but even every minutes do not work !

I make a cold reset of callpilot by f983 and #1 and no changes.

Any idea to make it work ?

Thanks,
Mike
 
I am now at pages not working in the AM but now do in the PM
I am currently building another BCM50, it was just at R2 and I have it at R6 with the latest 4 patches, still have to key code it, program and test it...most likely in the next 4 days.

________________________________________

Add me to LinkedIN

small-logo-sig.png

=----(((((((((()----=
Toronto, CAN
 
I confirm that AM do not work i setted it every hours of AM never had any page.

I saw it's wrote as a licence ''Advanced Paging Productivity Pack V1.0'' when see V1.0 i expect there is maybe other version or patch for it. However there is not many documentations about that feature.
 
It's just a key code anyway, the rest is in the release of software and or patches.

I just tested a clean install and both AM or PM work.

Next I will mimic my Callpilot programming only and test a lot through out the procedure.
I will not program anything else on the system.

One thing I recall is when you restore Callpilot to Factory Default the Advanced Paging Productivity tree disappears and is not listed at the bottom of EM, a reboot restores it.




________________________________________

Add me to LinkedIN

small-logo-sig.png

=----(((((((((()----=
Toronto, CAN
 
Guys ! I have an UPDATE !

I get crazy and reset everything ! i did Callpilot reinstall. and after i did a Telephony reset of the BCM AND i rebooted the BCM after Now it's work just made the test at 5:25PM i setted it 5 min before.


Other question not releated to the topic... If i do COLD RESET do i lose my keycodes ????


Thanks,
Mike
 
Thanks Exmogger for the tips.

Btw Guys, i have again an UPDATE !

I tryed after again and this is no more working ! AND ! i find WHY !

If i use the AVAYA Element Manager Shedule PAGING NEVER WORK !!!!! ( I used Nortel One on first time)

If i use the old Nortel Element Manager 60.3.0 IT ALWAYS WORK !!!

So there is a bug in the avaya element manager it don't transmit properly the information for paging settings.

The most crazy in it, i can set an alarm in avaya manager and it will display in my Nortel manager, but this is like if this is unactive... Very strange !

Mike
 
Damn....it works on my live system!
I also used EM 60.3.0 The last Nortel branded version and AM now works.

A star for the Docta! and ex for testing.

Will have to reload EM 62.0.5 from file instead of online or something.