MelissaS
Technical User
- Jan 14, 2011
- 3
A small number of A/P checks are being doubled in work in process and are showing up in job costing with the second entry having a source code of PY for the exact same amount as the first entry (the check). The second entry is being added by MAS 90. A\P and the other modules seem to be fine on the surface, it is only WIP and Job Cost.