Hi all
one of my customers currently have CC6 CCMA and CCMS on separate servers. I'm going to be upgrading their system to AACC 6.2 but as per customer request, they have provided me with the exactly same servers so that I can stage the AACC 6.2 and simply swap the hard drives instead of upgrading the production servers. This measure is being taken by the customer so in case there are any issues during the upgrade they can simply roll back to CC6 using the older Hard drives. I'm going to these this in the lab soon but wondering if someone has done this before?
The production CCMS server is exactly the same that is given to me for staging.
would appreciate any input
Thanks
Barzakh
one of my customers currently have CC6 CCMA and CCMS on separate servers. I'm going to be upgrading their system to AACC 6.2 but as per customer request, they have provided me with the exactly same servers so that I can stage the AACC 6.2 and simply swap the hard drives instead of upgrading the production servers. This measure is being taken by the customer so in case there are any issues during the upgrade they can simply roll back to CC6 using the older Hard drives. I'm going to these this in the lab soon but wondering if someone has done this before?
The production CCMS server is exactly the same that is given to me for staging.
would appreciate any input
Thanks
Barzakh