Hello,
One of my customer has an installation with two ICPs on IP Networking/Cluster aso in resiliency.
One 5550 console is installed on the primary ICP. If the primary ICP fail down, then everything "move" to secondary ICP via resiliency.
If for example, the 5550 console was in Night2 service, before primary ICP fail down, when connection on primary ICP becomes OK and 5550 console status changes to Day service then the secondary ICP stays on Night2 service.
We would like that when we select a Day/Night1/Night services on the 5550 console, which is on primary ICP, we also change the status on the secondary ICP.
Please, do you know how can I configure this?
One of my customer has an installation with two ICPs on IP Networking/Cluster aso in resiliency.
One 5550 console is installed on the primary ICP. If the primary ICP fail down, then everything "move" to secondary ICP via resiliency.
If for example, the 5550 console was in Night2 service, before primary ICP fail down, when connection on primary ICP becomes OK and 5550 console status changes to Day service then the secondary ICP stays on Night2 service.
We would like that when we select a Day/Night1/Night services on the 5550 console, which is on primary ICP, we also change the status on the secondary ICP.
Please, do you know how can I configure this?