Wondering if anyone has come across an error we're seeing in maintenance terminal- may be related to long term Qsig issues.
System is connected E1 to remote Mitel via Cisco router, rather unwisely a single E1 on one Cisco is switching the Qsig at protocol level using digit plan level to three...
The most common cause of cross-talk is split pairs- this could be the case if you, the remote party or an interconnect is using analogue trunks or extensions somewhere along the call.
Did see this once on a digital system whilst commissioning a 2Mb mux- timing had been set incorrectly and the...
There are two places that you set maximum trunks-
The "maximum number of VoIP calls" in the ICP/ PBX assignment is total max incoming and outgoing between two ICP's
The "maximum number of trunks" in the IP/ Xnet trunk group is for outgoing calls only (from online help- think of it as doing...
Looking to confirm a detail.
Does the "maximum number of trunks" in the IP/ Xnet trunk groups apply to IP trunks- ie if set to 3 this will only allow 3 outgoing calls on that IP trunk group?
Need to use this feature to provide a "priority" trunk group for specific users via COR restrictions so...
Installing MCD5.0 SP1 using MSI 11.0.1.11.
Get as far as entering app record ID and pressing "retrieve licenses" then software installer crashes completely.
I can browse to sync.mitel-amc.com. When I browse I have to acknowledge a content filter warning from client firewall so I'm wondering if...
I've been told that Xnet will not work over Qsig- only public ISDN. Anyone tried this?
Causes me a major issue as there's a Cisco "cloud" in the middle using Qsig digit routing between single E1's at each of the 4 sites.
Changing the routers means monumental levels of change control and will...
Thanks guys... partner is still indicating there's a "master", I've asked them to check with Mitel.
I really do wish Mitel would give its registered consultants some direct help to sell their systems!
I wasn't sure if you lost admin if the first system that you start sharing from was...
Does the same apply to SDS or must there be an SDS master?
My concern is the first cluster members go in on an offshore site which tend to change hands. If we use that as a "master" would we have to rebuild RDN using another node as master?
From what you say it sounds more like peer to peer so...
Planning a replacement of four industrial sites with two 3300 MXEIII's per site, MCD4.2. Each ICP has attached PER to split analogue phone service (95% of phones).
I'd planned to cluster each site pair to mimic the single SX2000 then just network the four clusters using ARS without PNI...
Wondering if anyone has knowledge/ manuals for antiques!
Anyone know what the power consumption for SX2000-S main/ expansion cabs were at 240/ 250VAC?
I need to know for a swap out to 3300 and can't find anything on cd or online that gives power consumption pre SX2000 Light :(
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.