At my job, we've recently deceided to go from <br>
UTP to STP in the 2-15 node LAN's that we build<br>
for clients because of recent problems. Having disagreements with co-workers about Grounding.<br>
I feel (from my limited electronical knowledge)<br>
that it makes more sense to only use the shield at<br>
one end of the cable, rather than possibly include a <br>
potential between grounds in buildings electrical<br>
wiring. I haven't seen a difference as of yet <br>
either way. Does anyone have an answer?
UTP to STP in the 2-15 node LAN's that we build<br>
for clients because of recent problems. Having disagreements with co-workers about Grounding.<br>
I feel (from my limited electronical knowledge)<br>
that it makes more sense to only use the shield at<br>
one end of the cable, rather than possibly include a <br>
potential between grounds in buildings electrical<br>
wiring. I haven't seen a difference as of yet <br>
either way. Does anyone have an answer?