Hello,
I really hope someone can give me some suggestions. I have a full project plan in MS Project right now. I am tracking 4 different parts of the project, which all have their own detailed tasks assigned. I need to be able to take all these tasks, and display them somewhere (I was thinking Visio) by their due dates. Originally, I just created my own Visio drawing and put each task in a box, and manually did it myself. This was ok - but the due dates are changing constantly, and that means I was manually changing my Visio drawing all the time which was very time consuming. I was wondering if there is a way to update my data in MS Project, and then export it and manipulate how I want it to display in Visio. Their timeline drawings don't work, because I need to see each task's detail just on the day it's due. OR- can Project do this all by itself? Can anyone help? I could even show you my original Visio drawing you you could see what I'm talking about. Thanks for any help!!
I really hope someone can give me some suggestions. I have a full project plan in MS Project right now. I am tracking 4 different parts of the project, which all have their own detailed tasks assigned. I need to be able to take all these tasks, and display them somewhere (I was thinking Visio) by their due dates. Originally, I just created my own Visio drawing and put each task in a box, and manually did it myself. This was ok - but the due dates are changing constantly, and that means I was manually changing my Visio drawing all the time which was very time consuming. I was wondering if there is a way to update my data in MS Project, and then export it and manipulate how I want it to display in Visio. Their timeline drawings don't work, because I need to see each task's detail just on the day it's due. OR- can Project do this all by itself? Can anyone help? I could even show you my original Visio drawing you you could see what I'm talking about. Thanks for any help!!