WillShakespeare
MIS
We have a few clients here that have US dates, rather than UK (as required), and most clients have the correct settings. We have played with these 'wrong' clients to make the date correct, but to no avail. Even changing things in the connection docs advanced settings.
I cannot say for sure that we haven't changed system time without closing Notes, or vice versa... so I was wondering whether we have done some 'damage' to the client that cannot be reversed. (I read in: thread73-47103 that you SHOULD NOT edit Systen Time settings while Notes is open).
If not, could anyone suggest how we could change the US format to UK (day/month/year, rather than month/day/year)?
Our resident Domino Administrator (my boss) says the problem is in the mail database, and on the server, so we would have to rebuild the Domino server to change this... I am not convinced.
I cannot say for sure that we haven't changed system time without closing Notes, or vice versa... so I was wondering whether we have done some 'damage' to the client that cannot be reversed. (I read in: thread73-47103 that you SHOULD NOT edit Systen Time settings while Notes is open).
If not, could anyone suggest how we could change the US format to UK (day/month/year, rather than month/day/year)?
Our resident Domino Administrator (my boss) says the problem is in the mail database, and on the server, so we would have to rebuild the Domino server to change this... I am not convinced.