Currently installed:
IP500 5.0.(22)
PRI (QSIG)
VCM 32
6 X 5610 IP Phones
IP500 Voice Networking Channels(4)
Voicemail Pro PREFRD(4 Ports)
ccr 1.2.23
1 X SUPERVISOR LIC
5 X AGENTS
1 X WIN2003 SERVER 2GB RAM
Is it possible to upgrade the CCR to CCR 6.0 and if so what are the requirements besides PC Ram upgrades?
IP500 5.0.(22)
PRI (QSIG)
VCM 32
6 X 5610 IP Phones
IP500 Voice Networking Channels(4)
Voicemail Pro PREFRD(4 Ports)
ccr 1.2.23
1 X SUPERVISOR LIC
5 X AGENTS
1 X WIN2003 SERVER 2GB RAM
Is it possible to upgrade the CCR to CCR 6.0 and if so what are the requirements besides PC Ram upgrades?