I have four Intranetware 4.11 servers. I need to move one of the servers (POS) to a better piece of hardware. If I build the new server into the tree and name it NEWPOS, can I change the name of the new box to POS when I am finished with the old box (POS)? How will the tree be affected?
This box is not and will be the primary NDS box.
Thanks
This box is not and will be the primary NDS box.
Thanks