Thanks for the previous advice.
I am now cosidering upgrading only one of our servers to 9.30 but this server is a replicate target (not server). Although Informix/IBM says that both are compatible and can have a mixed server environment, can some one verify for me that you can have a 7.31 Server with a 9.3 target.
Also can you use onbar Level 0 backup and restore on a 9.3 version, for migration?
thanks
I am now cosidering upgrading only one of our servers to 9.30 but this server is a replicate target (not server). Although Informix/IBM says that both are compatible and can have a mixed server environment, can some one verify for me that you can have a 7.31 Server with a 9.3 target.
Also can you use onbar Level 0 backup and restore on a 9.3 version, for migration?
thanks