I have a project files with the outline level going to 6 or 7 but I need to save the file so it can only be viewed to level 4. I was able to apply a filter to the project to give me what I need but when I Save As and reopen the file is back to normal with no filter applied. Is there a way to hide certain subtasks so when sending the file for review they only see the summary tasks?