Hi! Working in a portuguese bank and managing OPC i have the need to get info or experience from people that have OPC trackers in AS/400.
The question is about to know the capabilities of OPC functins in AS/400.
Can i trace jobs not scheduled by the opc controller? ie. jobs submited by the operator...but predecessors of planned jobs in OPC appls...
What can and cannot do with a tracker in AS/400 versus a tracker in S/390...
Thanks
The question is about to know the capabilities of OPC functins in AS/400.
Can i trace jobs not scheduled by the opc controller? ie. jobs submited by the operator...but predecessors of planned jobs in OPC appls...
What can and cannot do with a tracker in AS/400 versus a tracker in S/390...
Thanks