I have a single production server running everything, I also have an external SCSI enclosure with nearly a terabyte of storage sitting on the floor. I would like to take my production 6 server and upgrade to 6.5 and throw another 6.5 server at it with both connected to the SCSI enclosure. Has anyone pursued this (with a production server in the mix) or is it best to leave the production box alone and build the cluster with two new boxes for testing first. Just looking for some advise and headache stories before I begin.
Thanks in advance.