I currently have a spreadsheet that is supposed to do some projected time calculations.
In cell a1 I have the number of calls, 8. In b1, the average length of a call, 0:3:25. I multiply both of these cells and get the answer in c1,0:27:20. I have formatted all the time fields to be in the h:mm:ss format. I then want to be able to take the answer in c1 and divide it by 60minutes. This is where I am stuck. I keep on getting 0:00:27 by using the formula =sum(c1/60).
A1 b1 c1 d1
8 0:3:27 0:27:20 0:00:27
Can someone please help me out.
Thank you
In cell a1 I have the number of calls, 8. In b1, the average length of a call, 0:3:25. I multiply both of these cells and get the answer in c1,0:27:20. I have formatted all the time fields to be in the h:mm:ss format. I then want to be able to take the answer in c1 and divide it by 60minutes. This is where I am stuck. I keep on getting 0:00:27 by using the formula =sum(c1/60).
A1 b1 c1 d1
8 0:3:27 0:27:20 0:00:27
Can someone please help me out.
Thank you