Hello i have a problem.
i have a field set up as a number where users enter time.
Example
The user enters 4.5. They think they are entering 4 hours 50 minutes but it’s actually 4 1/2 hours.
Based on the way the field is set up I’d like 4.5 to mean 4.83333
4.5 converted to time is 4.83333
4+(50/60) 4.833333.
Is there a calc function someone can help me out with?
i have a field set up as a number where users enter time.
Example
The user enters 4.5. They think they are entering 4 hours 50 minutes but it’s actually 4 1/2 hours.
Based on the way the field is set up I’d like 4.5 to mean 4.83333
4.5 converted to time is 4.83333
4+(50/60) 4.833333.
Is there a calc function someone can help me out with?