I was very chuffed with myself when I installed and terminated 15 data points into a patch panel. They all tested ok first time as well.
Originally there was only one double point in the room so I disconnected one of them and used that cable for the backbone link to the main cab.However, this is proving very difficult to get working.
i have done evrything the same as before but I get a crossed icon on my tester and all four pairs are red.
I have looked at the patch panel the other end and it is slightly different in design but appears ok. WBL,BL,WO,O,WG,G,WBR,BR
Any adeas on how I should trouble shoot this. the other cabinet is about 50M away which does not help.
Cheers
I was very chuffed with myself when I installed and terminated 15 data points into a patch panel. They all tested ok first time as well.
Originally there was only one double point in the room so I disconnected one of them and used that cable for the backbone link to the main cab.However, this is proving very difficult to get working.
i have done evrything the same as before but I get a crossed icon on my tester and all four pairs are red.
I have looked at the patch panel the other end and it is slightly different in design but appears ok. WBL,BL,WO,O,WG,G,WBR,BR
Any adeas on how I should trouble shoot this. the other cabinet is about 50M away which does not help.
Cheers