hi,

I was very chuffed with myself when I installed and terminated 15 data points into a patch panel. They all tested ok first time as well.

Originally there was only one double point in the room so I disconnected one of them and used that cable for the backbone link to the main cab.However, this is proving very difficult to get working.

i have done evrything the same as before but I get a crossed icon on my tester and all four pairs are red.

I have looked at the patch panel the other end and it is slightly different in design but appears ok. WBL,BL,WO,O,WG,G,WBR,BR

Any adeas on how I should trouble shoot this. the other cabinet is about 50M away which does not help.



Cheers
 
What spec are you using for termination ?