Hello,
as far as i can see when you have tasks and subtasks the durartion for the task is decided by the length of the total duration of the subtasks. What happens when i know how long the task should take but I dont not know how long each of teh sub tasks will take, is there a way I can have the main task show the duration and the subtaks be blank?
as far as i can see when you have tasks and subtasks the durartion for the task is decided by the length of the total duration of the subtasks. What happens when i know how long the task should take but I dont not know how long each of teh sub tasks will take, is there a way I can have the main task show the duration and the subtaks be blank?