Stretchwickster
Programmer
Hi,
I have a form which contains several chart components. I want to be able to synchronize the drawing of 2 charts so that they plot equivalent points at the same time. At the moment the draw methods are located within each chart object. Apart from pulling out the drawing of both charts into one loop run from the form, is there a way to synchronize the drawing?
Your help would be much appreciated!
Clive![[infinity] [infinity] [infinity]](/data/assets/smilies/infinity.gif)
I have a form which contains several chart components. I want to be able to synchronize the drawing of 2 charts so that they plot equivalent points at the same time. At the moment the draw methods are located within each chart object. Apart from pulling out the drawing of both charts into one loop run from the form, is there a way to synchronize the drawing?
Your help would be much appreciated!
Clive
![[infinity] [infinity] [infinity]](/data/assets/smilies/infinity.gif)