Pbxpoweruser
IS-IT--Management
Hi,
I am trying to schedule an assignment on the NCC to network certain skillsets to certain sites on a specific time however the scheduling fails. I see it in Scheduled Events however the field Next Run Time is blank. Also when I press the schedule button however I get Failed to schedule this assignment.
1 - Should this schedule on the NCC server?
2 - If so I should see it in the Windows 2003 scheduled tasks window?
3 - How can i fix it?
thanks
I am trying to schedule an assignment on the NCC to network certain skillsets to certain sites on a specific time however the scheduling fails. I see it in Scheduled Events however the field Next Run Time is blank. Also when I press the schedule button however I get Failed to schedule this assignment.
1 - Should this schedule on the NCC server?
2 - If so I should see it in the Windows 2003 scheduled tasks window?
3 - How can i fix it?
thanks