string required message on datetime formula's

Status
Not open for further replies.

mbutch

Programmer
Nov 17, 2000
100
US
I'm using SCR 8.5 Dev with the latest hotfix and I'm having a big problem with formulas that use a datetime field. I keep getting "A string is required here." and "Bad String Format" error messages on all datetime related formulas and selections on existing reports (that used to work). If I create a new report, the datetime formulas work fine, but if I change the data location from development to production they stop working. What has this hot fix done to me? Is anyone else having similar problems?

Thanks.
 
Are you certain that it doesn't have something to do with the connectivity or database differences?

If you point to Prod and do a verify database, what happens?

-k
 
It says the database is up to date.

I think it is a bug related to one of the hot fixes I installed. The reports I started noticing this issue on are ones that have always worked and haven't been modified for months. They still work on clients with a viewer, but not on my dev machine.
 
Hotfixes I installed for 8.5:
SP1
ACTXVIEWWIN_EN_200303.EXE (ActiveX)
DBEXDRVRWIN_EN_200303.EXE (Database and Export)
CR85DEVWIN_EN_200303.EXE (developer Files)
RPTVIEWRWIN_EN_200302.EXE (Java Viewer)
CR85MAINWIN_EN_200303.EXE (Main Program)
CR85olap0702-EN.exe (olap)
 