Dec 3, 2003
3,841
DK
Here is the procedure for the startup of the ipLDK-20 - with UK country code.



First locate the battery DIP switch “SW1” and the protection switch to secure the database from NOT disappearing SW3.

The two switches are on the motherboard.

SW1 is the battery switch. (Set to ON)

SW3 has 4 pins 1-2-3-4.(ON by default).


1.

After having installed all the cards, make sure that the SW3, switch 4 to ON and
SW1 (battery back-up) to ON.

2.

Log on from the main extension digital keyset (e.g. station 10) by entering


Trans/prog + * + # + Trans / prog.



Then then enter 100 for PGM100 by pushing the flex button 1, entering 100, and then pressing the Hold / Save.
The main initialization to e.g. UK country code (English/UK standard numbering plan (number analysis) and programming) is done by entering flex button 1 / Nation Code: Enter 44 + Hold / Save.
3.
Then reset the system with reset button on the MPB.

Once this is done made ​​change the setiings of the following contacts:
It is important to have set SW3, switch 4 to OFF. That is the fourth contacts in SW3 to OFF.
SW1 to battery back-up is set to ON, the customer data is secured.


Now the UK country code is entered and the database is secured.

Then you are ready to program the facilities.



///doktor
____________________________________
 
Or - in other words:

The DIP switch (SW1) of Memory Backup Battery should be turned ON before installing the MBUE, to protect system data in the case of a power failure.
To prepare for pre programming, perform the following Steps:

1. Set the DIP switch (SW3) on the MBUE to ON.
2. To initialize all the data in Admin Programming, the 4th pole of SW3 should be set to ON.
3. Plug the AC power cord into the ipLDK-20 System and AC outlet.
4. Program the Country Code as applicable. Enter United Kingdom 44 (works best)
5. Reset the ipLDK-20 System.
6. Set the 4th pole of SW3 on the MBUE to OFF when the system operates normally. The 4th pole of SW3 is set to OFF, to protect the various features addressed by Admin Programming after system power-up and initialization.


///doktor
____________________________________
 
Do not try this on a live system, since it will wipe the database!
When PGM100 is ready go to PGM450 and initialize the database.
Then you are ready to program the keysets, CO lines and facilities.