Dear all,
How can I control the process of Stages that I have inside a job. Until now I only know that we can only control the process of jobs through Job Sequencer, or control the process of Output of Transform stage.
In my case, I have 4 stages in a job, Transform-1,Transform-2,Transform-3,Transform-4. I want to control the stages in the job to run in the correct order:
Transform-1 ==> Transform-2 ==> Transform-3 ==> Transform-4
If I can only do this through Job Sequencer, I need to create 4 jobs (with only 1 stage each) and a Job Sequencer, which is not efficient and easy to maintain for such a simple requirement.
Thank you...
Endy Lambey
How can I control the process of Stages that I have inside a job. Until now I only know that we can only control the process of jobs through Job Sequencer, or control the process of Output of Transform stage.
In my case, I have 4 stages in a job, Transform-1,Transform-2,Transform-3,Transform-4. I want to control the stages in the job to run in the correct order:
Transform-1 ==> Transform-2 ==> Transform-3 ==> Transform-4
If I can only do this through Job Sequencer, I need to create 4 jobs (with only 1 stage each) and a Job Sequencer, which is not efficient and easy to maintain for such a simple requirement.
Thank you...
Endy Lambey