I might have asked this before, but I've been getting mixed answers from different people, so I thought I'd ask again. This time with a more detailed scenario:
Within the same zone I have several remote sites with storage nodes. On those storage nodes I have direct attached disk, to which I want to backup to.
I then want to stage the backups to _another_ storage node over a WAN connection to a central data centre. The WAN connection can be considered to have sufficient bandwith, and the storage node in the data centre will place the data on another disk so I don't have to worry about shoe-shining on the tape drive.
On the storage node in the central data centre I want to stage the backup one more time from disk to tape.
The purpose is to elminate tape handling on the remote sites.
Although I see this as technically possible in NetWorker, since it's possible to clone between storage nodes, how feasible is it?
Can I create such a multi-step staging policy within the GUI, and expect it to run as smooth as staging is when it's only done in one step in one single storage node from disk to tape?
I don't want to have to script the process.
With regards to restores to a client in case the remote storage node with it's disk is lost, can I restore directly from the central data centre tape to the client with no or minimal reconfiguration. I was thinking of marking media suspect.
Within the same zone I have several remote sites with storage nodes. On those storage nodes I have direct attached disk, to which I want to backup to.
I then want to stage the backups to _another_ storage node over a WAN connection to a central data centre. The WAN connection can be considered to have sufficient bandwith, and the storage node in the data centre will place the data on another disk so I don't have to worry about shoe-shining on the tape drive.
On the storage node in the central data centre I want to stage the backup one more time from disk to tape.
The purpose is to elminate tape handling on the remote sites.
Although I see this as technically possible in NetWorker, since it's possible to clone between storage nodes, how feasible is it?
Can I create such a multi-step staging policy within the GUI, and expect it to run as smooth as staging is when it's only done in one step in one single storage node from disk to tape?
I don't want to have to script the process.
With regards to restores to a client in case the remote storage node with it's disk is lost, can I restore directly from the central data centre tape to the client with no or minimal reconfiguration. I was thinking of marking media suspect.