Hello.

Server A - Windows 2003; IIS 6.0; Cold Fusion MX
Web pages to have some https configurations;
Crystal Reports embeded into web applications;

Server B = CE 10; web connector to server B

Anyone having any tips or experiences they'd like to share in implemented the CE instance on a separate machine than the web server.

thanks a bunch.
 
You should be fine.

Although the Crystal Reports embedded into web applications might mean that you have a diffferent version of Crystal, which might cause problems.

-k
 
Hi,
as an extension of InSyncIIS' question:
I have the document from Crystal regarding 'High Availablilty' - It refers to CE8.5;I do not see a similar document for either CE9 or CE10..Do the same concepts apply and is it still a recommended method of assuring ( as much as is possible) uptime?
I am thinking of a 2 server method with all services ( except the APS/CMS) duplicated.
The load balancing and fail-over features seem to be what I am looking for.