Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations strongm on being selected by the Tek-Tips community for having the most helpful posts in the forums last week. Way to Go!

SMS 2003 Patch Management

Status
Not open for further replies.

JBRoom101

Technical User
May 23, 2007
1
GB
I have an environment where there are a number of clustered servers. I require one server to be patched, rebooted if required and then the other one done within a timescale of approximately one hour?
For load balanced servers I require these to be done almost simultaneously. The environment has about 200 servers in 1 domain with 1 SMS server. All clients have advanced client installed.

Any ideas where to start?
 
Why don't you create seperate collections. Such as 1 collection for the first group of nodes in the cluster, one for the second set of nodes and then a third collection with all the load balanced servers. You can then create separate advertisements for each collection with different start times to have the patches install the way you want.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top