I usually start at the CS change the HOST IP address change mask if required out old route and add new Route & enable. Update Database. If its a CS1000E change the IPs for the Media Gateways (Superloops). Once all the switch is up. Put the install disk in the Lead Sig Server, boot from CD in Install menu do Basic Sig Server Config and make changes to IP. Boot SS log into Element Manager delete old node and retrieve new one. Complete Node Config save transfer, reboot leader. Once up and stable boot followers and Media cards.
If its a release 5/5.5 do the MGC configs as well.
Callpilot Change the IP addresses in windows network connections then run through the config wizard in callpilot manager and change the server settings resellect the E & C LAN's Reboot. Symposium Not Sure but would expect it to be about the same alter the Network Connections then change the Configuration for the symposium (depends what type of syposium it is express,etc)
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.