Hi,
I've been trying to set up a workflow on a list using sharepoint designer 2010. I have two fields in my list that i want the workflow to create a task for when i change their status. For for field1 if i change from 'not received' to 'received' then create a task 'complete field1 work'. I want a similar thing to happen for field2 - creating a seperate task.
I've tried creating 2 if blocks, but only the first one runs. I've also tried putting these 2 if blocks inside a run parallel section, but i get an error when i edit the list.
Does anyone have any ideas?
Thanks in advance!
I've been trying to set up a workflow on a list using sharepoint designer 2010. I have two fields in my list that i want the workflow to create a task for when i change their status. For for field1 if i change from 'not received' to 'received' then create a task 'complete field1 work'. I want a similar thing to happen for field2 - creating a seperate task.
I've tried creating 2 if blocks, but only the first one runs. I've also tried putting these 2 if blocks inside a run parallel section, but i get an error when i edit the list.
Does anyone have any ideas?
Thanks in advance!