Not sure if this is design, or bug….
I have 2 workers doing Setup Operation. It takes 2 workers –3 hours consuming machine (6 total labor hours) to complete the setup.
On oper detail, # of employees is 2; if I load 6 Labor hours it costs right but doubles my MRP Lead Time. If I load 3 hours, SPC seems to ignore the 2 workers and costs this out at 3 hours, but my MRP Lead Time is correct.
I’m running 7.6.100a. I can’t tell if this is design issue or a bug? Any work around is much appreciated.