I'm having a problem when creating jobs in VM using the copy function. We are using the service centres functionality and we have about 5 service centres:
SERVICE CENTRE JOB NUMBERING
Central ------> JOB-C-......
South ------> JOB-S-......
North ------> JOB-N-......
and so on.
Now when a user creates a quotation or a job in VM he/she has to select their service centre so that the resulting job or quote is numbered properly(follows numbering convention of their respective service centres).
The problem I have is that when creating a job from an existing quotation (which was created from the central service centre) using the copy function, the resulting job no longer takes the central service centre numbering convention i.e, i get JOB......... instead of JOB-C-......
What could be causing this?
SERVICE CENTRE JOB NUMBERING
Central ------> JOB-C-......
South ------> JOB-S-......
North ------> JOB-N-......
and so on.
Now when a user creates a quotation or a job in VM he/she has to select their service centre so that the resulting job or quote is numbered properly(follows numbering convention of their respective service centres).
The problem I have is that when creating a job from an existing quotation (which was created from the central service centre) using the copy function, the resulting job no longer takes the central service centre numbering convention i.e, i get JOB......... instead of JOB-C-......
What could be causing this?