Sep 2, 2004 #1 lincon MIS Joined Dec 24, 2002 Messages 50 Location CN I create a schedule for a report at ten o'clock every night,but it cannot run always.It can run successfully if Manual do it. Why it is bug.
I create a schedule for a report at ten o'clock every night,but it cannot run always.It can run successfully if Manual do it. Why it is bug.
Sep 2, 2004 #2 JeannetteC Programmer Joined Aug 13, 2004 Messages 28 Location GB Hi, When you look at the schedule, does it give you any message about the report status? Does it say that it is still pending? Or purged? Or Failed? Thanks Jeannette Upvote 0 Downvote
Hi, When you look at the schedule, does it give you any message about the report status? Does it say that it is still pending? Or purged? Or Failed? Thanks Jeannette