I am using Crystal Designer XI and Business Objects Enterprise CMC XI.
We have a report that needs to be scheduled to run every night and sent to each Action Officer with only their own information on.
Currently there are 97 Action officers, so the report is scheduled 97 times and each scheduled instance has a different Action Officer entered into the parameter field (manually typed by me).
This list of Action Officers is constantly changing so the maintenance is high. Is there a way of scheduling the report to run per action officer by taking the value from the Action Officer field on the report rather than having to schedule so many instances and manually typing in the Action Officer name for each one?
Thanks in advance.
Jessica
I am using Crystal Designer XI and Business Objects Enterprise CMC XI.
We have a report that needs to be scheduled to run every night and sent to each Action Officer with only their own information on.
Currently there are 97 Action officers, so the report is scheduled 97 times and each scheduled instance has a different Action Officer entered into the parameter field (manually typed by me).
This list of Action Officers is constantly changing so the maintenance is high. Is there a way of scheduling the report to run per action officer by taking the value from the Action Officer field on the report rather than having to schedule so many instances and manually typing in the Action Officer name for each one?
Thanks in advance.