BrianAustin1949
Programmer
Having created a report in CR v 8 to run live, utilising a parameter field to input a date range. It has now been decided to look at the possibilities of utilising the scheduling facilities in windows 98. The date parameters can be set into the report, but following the loading of the report using scheduler, how can the report be refreshed.
Regards Brian
Regards Brian