petejigsaw
MIS
I have a report which shows sales in given statistical periods (based on a start date and end date parameter), which is run manually when required.
I'd like to schedule it to Enterprise, but am unsure how to set-up the schedule. The report is over either 4 or 5 week periods, but obviously if I simply use a calendar, the report doesn't have start and end dates to work with.
Is it possible to create a schedule that runs a report based on the 'period since last run'????
I'm using CR 2008 to write the reports, and CR Server 2008 for deployment.
Thanks
Peter
I'd like to schedule it to Enterprise, but am unsure how to set-up the schedule. The report is over either 4 or 5 week periods, but obviously if I simply use a calendar, the report doesn't have start and end dates to work with.
Is it possible to create a schedule that runs a report based on the 'period since last run'????
I'm using CR 2008 to write the reports, and CR Server 2008 for deployment.
Thanks
Peter