chittenden
Technical User
I have a series of reports for each of our divisions I have setup tasks using Scheduler to run the reports and save them as PDF files in a separate directory. Each divisions reports run at different times during the day on Fridays. The following occurred this week:
Division 1 reports - 5 reports set to run at 12pm. The first 3 reports ran fine; the 4th report generated but did not save as PDF; the 5th report opened but presented no data and did not save as a PDF file
Division 2 reports - 5 reports - I have these spaced out in 1 minutes intervals beginning at 3pm to see if that is the issue(each report takes only a few seconds to generate). The results were the same as division 1
Division 3 reports - 5 reports set to run at 4pm. All reports ran, data appeared, but no reports saved as PDF files
Division 4 reports - 5 reports set to run at 4:15 pm. Same results as division 3
Division 5 reports - 3 reports set to begin at 5pm in spaced in 1 minute intervals. The first report did not run at all. The next 2 ran and saved successfully
Division 6 reports - 3 reports set to begin at 5:03pm spaced in 1 minute intervals. All reports ran and saved successfully
After all reports completed (or not) for the day I closed the Scheduler program and received the an error message which read "Run-time error '6148' Invalid Row Number"
Anyone have any thoughts on this?
Division 1 reports - 5 reports set to run at 12pm. The first 3 reports ran fine; the 4th report generated but did not save as PDF; the 5th report opened but presented no data and did not save as a PDF file
Division 2 reports - 5 reports - I have these spaced out in 1 minutes intervals beginning at 3pm to see if that is the issue(each report takes only a few seconds to generate). The results were the same as division 1
Division 3 reports - 5 reports set to run at 4pm. All reports ran, data appeared, but no reports saved as PDF files
Division 4 reports - 5 reports set to run at 4:15 pm. Same results as division 3
Division 5 reports - 3 reports set to begin at 5pm in spaced in 1 minute intervals. The first report did not run at all. The next 2 ran and saved successfully
Division 6 reports - 3 reports set to begin at 5:03pm spaced in 1 minute intervals. All reports ran and saved successfully
After all reports completed (or not) for the day I closed the Scheduler program and received the an error message which read "Run-time error '6148' Invalid Row Number"
Anyone have any thoughts on this?