I just inherited a PS 7.5x process scheduler installation running on NT. It will be switched to 8 soon, but 7.5 will be running for the next month or so. We have 2 instances of the scheduler running. One of them switches the log file 5 times every 10 seconds. The other instance switches the log file 5 times every 15 seconds. The schedulers have been closing out on their own, so I believe the problem may be with these constantly changing log files.
When I say switch log files, the log will write "Switching log files... log file switched", 5 times in sucession, then after an interval, will repeat.
Any ideas?
TIA
When I say switch log files, the log will write "Switching log files... log file switched", 5 times in sucession, then after an interval, will repeat.
Any ideas?
TIA