Backup Exec 8.6 has the ability to schedule restores but ... How can I schedule it to change which day it's restoring?
For instance
-Media set
--8/7/2002 8:00pm jobtype-tapename-jobname etc
----files
--8/8/2002
----files
etc
I need it to switch to the next day every time the job is run. What we are doing is a backup of sharepoint, etc...and then it is going to restore sharepoint to another server which is fully functional and ready in case of disaster (we use the sharepoint agent). Everything works great. We just don't want to have to touch the server everyday to put a checkmark in the next day to run the restore. The tape holds about a week or more of backups and we do not want to overwrite it everyday and there is only one drive, no slot media.
Hope that made sense.
please help
thank ya
For instance
-Media set
--8/7/2002 8:00pm jobtype-tapename-jobname etc
----files
--8/8/2002
----files
etc
I need it to switch to the next day every time the job is run. What we are doing is a backup of sharepoint, etc...and then it is going to restore sharepoint to another server which is fully functional and ready in case of disaster (we use the sharepoint agent). Everything works great. We just don't want to have to touch the server everyday to put a checkmark in the next day to run the restore. The tape holds about a week or more of backups and we do not want to overwrite it everyday and there is only one drive, no slot media.
Hope that made sense.
please help
thank ya