We are running SQL 2000. I have one job that has 3 different schedules in it. It is scheduled to run Mon-Fri every 5 mins from 8:00 to 8:30. It's also scheduled to run every 10 mins from 10:00 to 11:00 and every half hour from 2:00 to 6:00. So there are 3 different schedules inside one job. The problem is that these 3 jobs seem to disable themselves at random. I can enable them and close the job, when I open it again at least one of them is now disabled. I've tried re-scheduling them and changing the dates or times slightly and the same thing happens. Any ideas?