Hello,
Is possible to schedule a report to run every 30 minutes? The only way I can think of, is to create each individual schedule separately, which results in a screen full of schedules.
Is there a better way that this can be achieved?
Thanks in advance.
Aftab.
Is possible to schedule a report to run every 30 minutes? The only way I can think of, is to create each individual schedule separately, which results in a screen full of schedules.
Is there a better way that this can be achieved?
Thanks in advance.
Aftab.