Hello,
I just installed the Arcserve SAN option on 3 server (1- the Primary SAN server, 2*Node of a Cluster) and wanted to schedule a set of job to run on the same media.
Config of the job I'm trying to run:
1 - The primary server start first on Media Pool "MyPool", option mention erasing the tape
2 - Cluster node are starting after also on Media Pool "MyPool", options setup to add to tape
I'm using custom Schedule (Full every day). Here is the result:
The Primary serve picked up a tape from the scratch set, format it and write data=> That's fine
The secondary server add their sessions ..to the next available Scratch Media, and not the media just written by the Primary.
I guess I misconfigured something, but could not find much help in the doc.
Any tips will be welcome,
Thanks,
Chris
I just installed the Arcserve SAN option on 3 server (1- the Primary SAN server, 2*Node of a Cluster) and wanted to schedule a set of job to run on the same media.
Config of the job I'm trying to run:
1 - The primary server start first on Media Pool "MyPool", option mention erasing the tape
2 - Cluster node are starting after also on Media Pool "MyPool", options setup to add to tape
I'm using custom Schedule (Full every day). Here is the result:
The Primary serve picked up a tape from the scratch set, format it and write data=> That's fine
The secondary server add their sessions ..to the next available Scratch Media, and not the media just written by the Primary.
I guess I misconfigured something, but could not find much help in the doc.
Any tips will be welcome,
Thanks,
Chris