Hi

we set up a SAN environment consisting of 5 NW Servers (Backup Server, 2-Node Groupwise Cluster, 2-Node File-Cluster). On every machine we set up a backup job (5-Day Rotation). The backup jobs are running, but every job requests a new tape. All tapes belong to the Media Pool NW_DAILY
How do we have to configure the job, so that the servers will share the tapes and append their job to the previous written tape?
 