I'm waiting for my maintainer to remove a LIM from my 10-LIM system (BC10, LIM has no active trunks/extns/groups and no common program units), but need to power it down sooner due to building work.
Is there any way I can still have an updateable system with one LIM powered down?
N.B. I only have a level 4 password.
Is there any way I can still have an updateable system with one LIM powered down?
N.B. I only have a level 4 password.