Hi,

we just added another backup drive.

Can we run 2 jobs simultaneously on the 2 drives or does 1 job has to finish before the 2nd one run? Each job will backup a tape on each drive.

The drives are HP Ultrium LT04, using Arcserve Brightstor r11.5 SP4 running on Windows Server 2003.

Thanks.
 
manager > device window > group config > create a 2nd group > remove the 2nd tape drive from the 1st and then add to the 2nd
 