muddyfox1009
IS-IT--Management
Hi,
we just added another backup drive.
Can we run 2 jobs simultaneously on the 2 drives or does 1 job has to finish before the 2nd one run? Each job will backup a tape on each drive.
The drives are HP Ultrium LT04, using Arcserve Brightstor r11.5 SP4 running on Windows Server 2003.
Thanks.
we just added another backup drive.
Can we run 2 jobs simultaneously on the 2 drives or does 1 job has to finish before the 2nd one run? Each job will backup a tape on each drive.
The drives are HP Ultrium LT04, using Arcserve Brightstor r11.5 SP4 running on Windows Server 2003.
Thanks.