Guest_imported
New member
- Jan 1, 1970
- 0
How do I create a calculated member that returns the first (or last) day in a time set? Fo example, if I had drilled down to [Time].[2001].[Q1] I would want to return the value 1/1/2001 (or 3/31/2001 if I was looking for last).
The leaf member in Time dimension is Day, but every day on the calender does NOT have a corresponding day in the database.
Thanks in advance...
The leaf member in Time dimension is Day, but every day on the calender does NOT have a corresponding day in the database.
Thanks in advance...