I am using Crystal Reports 2008. I have a CYTD parameter with a start date (4/1/2013) and an end date (6/15/2013) and a PYTD parameter with a start date (4/1/2012) and end date (6/15/2012). I need to determine the number of working days in the end portion of my CYTD parameter (June 1-15, 2013). I can figure the total working days for the entire range using Minimum and Maxium on the full range, but can't figure out how to get just the ending date portion. Thank you in advance.
Karen
Karen