I have a bill of materials that I took out a few line numbers in the middle and now the bom has missing numbers example: 5.. 10.. 20..30 .. 35...
I took out 15 25 etc.. so I figured/want to re-sequence them to 5 10 15 20 25
I posted my Engineering Changes.. and then working on a bill of materials in BOM -> Process -> Reseq Component Items, this keeps coming back with an error message "you must post engineering changes before running process"
Please help!
Thanks in advance
-Ash
Macola 7.6.400b SQL
I took out 15 25 etc.. so I figured/want to re-sequence them to 5 10 15 20 25
I posted my Engineering Changes.. and then working on a bill of materials in BOM -> Process -> Reseq Component Items, this keeps coming back with an error message "you must post engineering changes before running process"