johncharlton
Technical User
- Jan 7, 2003
- 1
Hi all,
Simple question which I'm struggling to answer. If I run an application report and the threshold for calls answered within xxx is set to 20 secs, and then change the threshold to 30 sec, and rerun the report, does CC6 peg thresholds at the point at which they are exceeded on a call, or does it calculate it on the fly - so in theory I could change the threshold class and rerun a historic report to see the difference...?
Does that make sense!?
Rgds John
Simple question which I'm struggling to answer. If I run an application report and the threshold for calls answered within xxx is set to 20 secs, and then change the threshold to 30 sec, and rerun the report, does CC6 peg thresholds at the point at which they are exceeded on a call, or does it calculate it on the fly - so in theory I could change the threshold class and rerun a historic report to see the difference...?
Does that make sense!?
Rgds John